25 | On 04/15/2026 at 12:25 PM, Licensing Program Analyst (LPA) Gabriela Hernandez conducted an unannounced annual inspection for a large family childcare at the above home. LPA met with Licensee Cecilia Mendoza, who guided LPA on a tour of the home. There was 5 children present with Licensee and Assistant when LPA arrived. During the visit, the Licensee confirmed they have 17 children enrolled in their family day care.
The facility operates Monday through Friday from 5:30 AM to 5:30 PM each day. Certain areas are off-limits, including the Entire 2nd floor, laundry room, Bedroom #1, Garage, and Backyard. The facility is licensed as a large Family Child Care Home (FCCH) with a maximum capacity of 14 children and is operating within the licensed capacity of the license. The fire clearance for a large family child care was approved on 04/10/2025 by Riverside County Fire Department.
During the inspection, LPA verified a working cell phone is available, and the current phone number and email on file are correct. A fully charged fire extinguisher (2A:10BC) was observed, along with a functioning smoke detector and carbon monoxide detector, both of which were tested by the Licensee. There is no fireplace in the home. All hazardous items, including toxins, were stored securely and were accessible to children. See 809-D for cited deficiency. There are firearms present and LPA Hernandez verified they are stored according to Title 22 regulations. Licensee, Cecilia Mendoza, understands that all firearms, weapons, and ammunition must be locked separately and made inaccessible as per Title 22 Regulations. Stairs are barricaded with a baby gate when children are in care.
The facility provides clean, safe, and age-appropriate toys for children. A current roster is not on file; see 809-D for cited deficiency. All required postings, including the Facility Sketch, Emergency Disaster Plan, and Notification of Parent’s Rights, are displayed. Fire and disaster drill documentation is maintained, with the last drill conducted on June 20, 2025; Type B deficiency issued.
|