| Preschool Playground Building 1
1. All wrought iron fencing must measure at least 4 ft tall when dividing components.
2. Repair rust on climbing structure on the playground.
3. There are ongoing repairs one of the 3 preschool playgrounds, the facility will install turf, repair climbing structure and add age appropriate toys.
4. Repair all damaged rubber matting throughout the preschool playgrounds.
Infant Rooms Measurements:
1. Infant room 1 and 10 will be measured once the crib area in room 10 is set up.
Pending NOIA Documents will be submitted.
Ms. Bednar understands that all proof of corrections must be provided to the Department within 30 days, or the application may be denied.
Assembly Bill (AB) 2370, Chapter 676, Statutes of 2018, requires all licensed Child Care Centers (CCCs) constructed before January 1, 2010, to test their water (used for drinking and food preparation) for lead contamination before January 1, 2023, and then every 5-years after the date of the first test. For child care center licenses issued after July 1, 2022, the licensee shall test their water for lead within 180 days of licensure pursuant to Written Directives section 101700 (PIN 21-21.1- CCP). Please note that if your building was constructed after 1/1/10, you are not required to test for lead. However, you must provide proof of the construction date to the regional office.
|