25 | On 2/7/24 at 1:00pm, Licensing Program Analyst (LPA) Kevin Gould conducted an unannounced Plan of Correction (POC) inspection to ensure previous plans of corrections have been addressed and completed per the plan of correction identified during the complaint inspection on 1/31/24.
LPA Gould tested the hot water temperature and recorded a temperature 116 degrees which meets title 22 regulations. The deficiency is cleared and POC letter generated.
Exit interview conducted and a copy of this report was left at the facility. |