<meta name="robots" content="noindex">
Department of
SOCIAL SERVICES

Community Care Licensing


COMPLAINT INVESTIGATION REPORT

Facility Number: 342702896
Report Date: 09/16/2026
Date Signed: 09/16/2026 02:59:47 PM

Unsubstantiated


STATE OF CALIFORNIA - HEALTH AND HUMAN SERVICES AGENCY

COMPLAINT INVESTIGATION REPORT
CALIFORNIA DEPARTMENT OF SOCIAL SERVICES
COMMUNITY CARE LICENSING DIVISION
SACRAMENTO SOUTH ASC, 9835 GOETHE ROAD, SUITE 100
SACRAMENTO, CA 95827
This is an official report of an unannounced visit/investigation of a complaint received in our office on
07/28/2026 and conducted by Evaluator Pang Lee
PUBLIC
COMPLAINT CONTROL NUMBER: 27-AS-20260728121019
FACILITY NAME:LEGACY OAKS OF SACRAMENTOFACILITY NUMBER:
342702896
ADMINISTRATOR:DONNABELL GALICIAFACILITY TYPE:
740
ADDRESS:1922 MORSE AVENUETELEPHONE:
(916) 482-7745
CITY:SACRAMENTOSTATE: CAZIP CODE:
95825
CAPACITY:160CENSUS: 76DATE:
09/16/2026
UNANNOUNCEDTIME BEGAN:
08:27 AM
MET WITH:Mery Lyn Otero and Shreetika Chand TIME COMPLETED:
10:00 AM
ALLEGATION(S):
1
2
3
4
5
6
7
8
9
The facility roof is in disrepair
INVESTIGATION FINDINGS:
1
2
3
4
5
6
7
8
9
10
11
12
13
On 09/16/2026, Licensing Program Analyst (LPA) Pang Lee arrived unannounced to this facility to conduct a complaint visit. LPA Lee met with met with Resident Service Director Mery Lyn Otero and Memory Care Director Shreetika Chand and explained the purpose of the visit. The purpose of this visit is to deliver complaint finding for the above allegation. The current census is 76. A brief interview was conducted with Licensee Shelly Cha.

It was alleged that the facility roof was in disrepair. The investigation consisted of staff interviews, record reviews, and observations. The investigation revealed that the reported water leaks originated from a supply line serving the facility’s heating and air conditioning system. Although leaks recurred, the facility promptly addressed each incident and arranged for repairs. On 06/02/2026, a heating and air conditioning company was repairing a blower in the hallway near the front of the building when a valve controlling the water supply broke, causing water to leak. A temporary pipe was installed.
CONTINUED LIC 9099-C
Unsubstantiated
Estimated Days of Completion:
SUPERVISORS NAME: Arielle Pascua
LICENSING EVALUATOR NAME: Pang Lee
LICENSING EVALUATOR SIGNATURE:

DATE: 09/16/2026
I acknowledge receipt of this form and understand my licensing appeal rights as explained and received.
FACILITY REPRESENTATIVE SIGNATURE:

DATE: 09/16/2026
This report must be available at Child Care and Group Home facilities for public review for 3 years.
LIC9099 (FAS) - (06/04)
Page: 1 of 2
Control Number 27-AS-20260728121019
STATE OF CALIFORNIA - HEALTH AND HUMAN SERVICES AGENCY

COMPLAINT INVESTIGATION REPORT (Cont)
CALIFORNIA DEPARTMENT OF SOCIAL SERVICES
COMMUNITY CARE LICENSING DIVISION
SACRAMENTO SOUTH ASC, 9835 GOETHE ROAD, SUITE 100
SACRAMENTO, CA 95827
FACILITY NAME: LEGACY OAKS OF SACRAMENTO
FACILITY NUMBER: 342702896
VISIT DATE: 09/16/2026
NARRATIVE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
On 07/15/2026, staff identified another water leak and determined that the temporary pipe had become loose. The facility contacted the plumbing company that same day, and maintenance repaired the temporary pipe. On 07/20/2026, the temporary pipe failed again. The facility contacted the plumbing company that same day, and a temporary repair was made to stop the leak while the appropriate replacement pipe was ordered. The plumbing company scheduled a follow-up visit and returned on 07/22/2026 to install the permanent replacement pipe and complete the repair.

Plumbing invoices and service notes documented that the supply line to the air handler for the chiller unit in the hallway next to the activity room had failed, resulting in hallway flooding and the building’s water supply being shut off. The records identified the previous repair as a PVC hose secured to copper lines with two hose clamps. After attempts to patch the line were unsuccessful, the repair was completed using copper piping. During facility visits on 08/06/2026 and 08/21/2026, LPA Lee did not observe active water leaks or roof was in disrepair. Interviews and records reviewed indicated that the facility responded promptly to the leaks, contacted repair providers on the same day the incidents occurred, and followed through until the permanent repair was completed. Based on interviews, record reviews, and observations, LPA Lee was unable to corroborate the allegation that the facility roof was in disrepair.

The investigation revealed the preponderance of evidence standards have not been met; therefore, the above allegation is found to be UNSUBSTANTIATED. A finding that the complaint allegation is UNSUBSTANTIATED means that although the allegation may have happened or is valid, there is not a preponderance of the evidence to prove that the alleged violation(s)occurred. An exit interview was conducted with Regional Resident Service Director Otero , and a copy of this LIC 9099 report was provided to facility.
SUPERVISORS NAME: Arielle Pascua
LICENSING EVALUATOR NAME: Pang Lee
LICENSING EVALUATOR SIGNATURE:

DATE: 09/16/2026
I acknowledge receipt of this form and understand my licensing appeal rights as explained and received.
FACILITY REPRESENTATIVE SIGNATURE:

DATE: 09/16/2026
LIC9099 (FAS) - (06/04)
Page: 2 of 2