1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) Gagandeep Singh and Licensing Program Manager (LPM) met with facility representative, Esmeralda Diaz, for an annual inspection. The purpose of the inspection was explained. During inspection, there are eleven day care children in care with two adult's supervision. All adults living or working in the home have criminal background check on file. Licensee provides day care from Monday to Friday between 7 AM to 6 PM.
LPA and LPM inspected the day care areas with the licensee. Day Care Areas: Living room, Kitchen, Hallway, Play room, Bathroom and Backyard. Off limit areas: Master bedroom, Garage. The house is in good repair and free of hazards with proper temperature and ventilation. There is carbon monoxide detector, smoke detector, fully charged fire extinguisher and working telephone available in the house. All the cleaning supplies, poisons and other chemicals are stored inaccessible to the children. Cabinets in kitchen and bathroom have child protective locks installed. There is water pond in the back yard and is inaccessible for children. There is a variety of age appropriate toys in the house. Fireplace has metal screen protector in place.
LPA reviewed the facility records. LPA observed licensee has License and other required documents posted in the child care areas. Both of the licensees have record of training of preventive health and CPR card valid until July 2023. Licensees are aware that all staff is required to complete Mandated Reporter Training every two years. The training can be obtained online at www.mandatedreporterca.com. LPA observed licensees have completion certificate on file and per certificate, the training is valid until January 2024. LPA also reviewed the random children's record. LPA reviewed the identification and emergency information form for every child for proper names and numbers filled. Licensee has record of immunization of each child in care. LPA observed facility has fire drill log in place and per log, last drill was conducted on June 01, 2023.
See next page for continuation ......... |