25 | Licensing Program Analysts (LPA) Rayshaun Nickolas conducted an announced visit to the facility for the purpose of verifying corrections from the initial Pre-Licensing inspection on July 11, 2022. At approximately 9:55 AM. LPA was greeted and granted entry by Licensee Violeta Hermogino . LPA observed the following:
Kitchen water temperature: The water temperature is 106.8.
Bathroom # 1 water temperature: The water temperature is 108.1.
LIC 610D Emergency and Disaster Plan: Posted at the facility.
LPA has determined that the facility is meeting operational requirements. LPA completed COMP III with Licensee and Administrator. The pre-licensing inspection is complete and this facility has no deficiencies. Licensee has satisfied all requirements in accordance with Title 22, California Code of Regulations.
An exit interview was conducted where this report was discussed and a copy was emailed to the Licensee. |