25 | Licensing Program Analyst (LPA) Ramon Serrano conducted an unannounced Required Annual Inspection. The facility file was reviewed prior to the visit. LPA was welcomed by, identified themselves to, and discussed the purpose of the visit with Executive Director (ED) Ronald Ellenich and Administrator in training (AIT) Blair Barnett.
The facility serves two hundred (200) elderly residents age sixty (60) and above; six (6) of whom may be non-ambulatory and may use rooms #101- #106. There is an approved hospice waiver for three (3) residents. This is a 11 story complex, with no delayed egress and secured perimeters.
LPA, accompanied by ED and AIT toured the interior and exterior of the facility. The facility was clean, sanitary, and in good repair. Pathways were free of obstruction and slip hazards. Resident bedrooms contained the required furnishings. Doors, windows, toilets, and showers were in working order. Extra linens and hygiene supplies were present, as well as Personal Protective Equipment. Hot water temperature and ambient temperatures were at compliant readings. The facility had sufficient space and equipment to facilitate dining, laundry, visitation, meetings, and resident activities.
There was at least 2 days of perishable food, and at least 7 days non-perishable food present, all safely stored. Cooking/dining equipment and utensils were present. There were no toxic chemicals/poisons accessible to residents. Medications are not centrally stored due to the facility being an independent facility.
Their are no bodies of water on the premises. Per Executive Director, no firearms or ammunition are kept at the facility. Carbon monoxide detectors, emergency lighting, and facility telephone were all working. Fire extinguisher(s) were present. Required licensing postings were observed in visible areas of the facility.
|