25 | Licensing Program Analyst (LPA) Juliana Barfield conducted an announced Pre-Licensing visit to observe the facility’s physical plant for compliance with Title 22, Division 6 of the California Code of Regulations and California Health & Safety Code. LPA was greeted by, identified themselves to, and explained the purpose of the visit to Administrator Faizan Jamil and Licensee Harris Jamil.
The facility fire clearance was granted on 02/02/2024 and reflected that the facility was approved for sixty-eight (68) residents in total, of which 38 maybe non-ambulatory and 30 residents may be bedridden. The facility's fire clearance did not include endorsements for delayed-egress doors or secured perimeter. The submitted facility sketch was consistent with the current layout of the facility.
During today’s visit, LPA, accompanied by Administrator Faizan Jamil and Licensee Harris Jamil, toured the interior and exterior of the facility and inspected each room. The facility was clean, sanitary, and in good repair. Pathways were well lit and free of obstruction and slip hazards. Resident bedrooms and hallways allowed for easy passage and contained the required furnishings. Toilets, sinks, and showers were in working order. The facility’s ambient internal temperature was compliant at 72 degrees F. Hot water temperature at taps accessible to residents were also compliant.
The facility has enough linens, cooking and dining supplies, and non-perishable food for future resident use. All kitchen appliances were in working order. Kitchen refrigerator temperature was 40 F, and kitchen freezer temperature was 0 F.
[CONTINUED ON LIC 809-C],
|