25 | Licensing Program Analyst (LPA) Amy Rodgers conducted an announced Pre-Licensing visit to observe the facility’s physical plant for compliance with Title 22, Division 6 of the California Code of Regulations and California Health & Safety Code. LPA was greeted by, identified herself to, and explained the purpose of the visit to the applicant’s representative, Administrator Maryl Evangelista.
The facility fire clearance was granted on 2/7/2024 and reflected that the facility was approved for six (6) residents in total, of which all may be non-ambulatory and one (1) may be bedridden in room 2 only.Hospice Waiver granted for six (6)The facility's fire clearance did not include delayed-egress door or secured perimeter endorsements, and neither were present during today's visit. The submitted facility sketch was consistent with the current layout of the facility.
During today’s visit, LPA, accompanied by the applicant’s representative, toured the interior and exterior of the facility and inspected each room. The facility was clean, sanitary, and in good repair. Pathways were well lit and free of obstruction and slip hazards. Resident bedrooms allowed for easy passage and contained the required furnishings. Toilets, sinks, and showers were in working order. The facility’s ambient internal temperature was compliant at 73 degrees F. Hot water temperature at taps accessible to residents were also compliant.
The facility has enough linens, hygiene supplies, cooking and dining supplies, and perishable and non-perishable food for future resident use. All kitchen appliances were in working order. Refrigerator temperature was 38 F, and freezer temperature was 0 F.
The facility has sufficient space and equipment to facilitate laundry, visitation, meetings, and resident activities. The facility has locked areas for storage of sharp objects, medication, and confidential resident and staff records.
|