1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On 4/29/22 at 1:00pm, Licensing Program Analyst (LPA) Cindy Meier conducted an announced Pre-licensing inspection with applicant, Diana Cervantes. The purpose of the inspection is to ensure the home is in compliance with standards established in CCR, Title 22, Division 12, Chapter 3, for Family Child Care Homes. This one story, four bedroom, two bath home was toured and inspected. The hours of operation are Monday through Saturday, 6:00 a.m. to 12:00 a.m.
Upon arrival LPA observed the home was under construction which included scaffolding, black wrap paper and chicken wire in the front and back areas. LPA also observed scaffolding and electrical wiring hanging from the rafters in the back play yard.
The LPA informed the applicant that the home could not be approved for a licensee at this time as the construction and equipment poses a risk to the health and safety of the children in care.
Applicant will inform LPA when the construction is complete and LPA will schedule another Pre-Licensing inspection. |