1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On 10/8/25, at 11:45 AM, Licensing Program Analyst (LPA) Matthew Sapien conducted an annual random inspection of the abovementioned Child Care Center (CCC). LPA met with Doris Angel and Sierra Day, Facility Representatives of the CCC, and explained the nature and purpose of the inspection. The LPA, in the company of the Facility Representatives, toured the interior and exterior of the CCC. The CCC operates out of the following areas at the center: explorer's classroom, smiley's classroom, treasures classroom, butterflies classroom, two outdoor playgrounds, and four bathrooms. The CCC is on the grounds of Peace Lutheran Church.
The CCC operates Monday through Friday from 7:30 AM until 5:30 PM. During the inspection, LPA observed 48 children in care along with 5 staff members, all of whom are cleared and associated.
All of the classrooms at the CCC are clean and orderly. The classrooms have age-appropriate equipment and furnishings for children in care. Each classroom contains various closets and a number of cabinets all of which contain items, equipment, and other related objects for children in care. As mentioned prior, the CCC utilizes fours bathrooms in total for children in care. Each bathroom was found to be clean, orderly, and rid of any hazardous items for children in care.
The CCC possesses operational mini-refrigerators and full size refrigerators within classrooms that possess food items and water for children in care. Children enjoy a morning snack (brought from home), lunch (also brought from home), and an afternoon snack (provided by the CCC). There is available drinking water for children at the CCC via filtered water jugs.
CCCs constructed before 1/1/20, are supposed to test their water (used for drinking and food preparation) for lead contamination before 1/1/23, and then every 5-years except after the date of the first test. For child care center licenses issued after 7/1/22, the licensee shall test their water for lead within 180 days of (CONT. LIC 809-C, Page 2)
|