25 | Licensing Program Analyst (LPA) Miller arrived at 10:00 a.m. to conduct a one-year annual visit to the facility above. LPA met with Cherlyn Cradduck, Administrator and explained the purpose of the visit.
A tour of the inside and outside of the facility was conducted. The following was inspected and noted during the annual visit:
Physical Plant & Environment Safety: The facility has 3 resident bedrooms, and 2 bathrooms. Facility currently occupies 3 residents and employs 6 full time staff, 5 on-call staff and one Administrator. LPA Miller was authorized to enter and inspect facility. The facility had a smoke and carbon monoxide detector that was tested and working properly during visit. The lighting and lamps are sufficient for the use of the facility and for resident comfort. Toilet, hand washing and bathing facilities are operational and secured grab bars are present. The showers have non-skid mats. The pathways are clear of any obstructions. Facility is well lit inside and outside for safety. Disinfectant, cleaning solutions and poisons are inaccessible to residents in care locked in cabinets. The facility has sufficient space inside and outside for activities and visiting. The facility has a fenced backyard for client use and front patio has plenty of shade from umbrella. The facility has telephone and internet service for resident use.
Operational Requirements: The facility has a current plan of operation on file with the department. The facility has current liability insurance and expires on April 7, 2024. The facility is approved for a capacity of six. The fire clearance is granted for 6 non-Ambulatory of which one may be bedridden. Hospice is approved for two.
Staffing: The facility currently employes 6 full time staff, 5 on-call time staff and one Administrator. Staff files were reviewed. Current Administrator Certificate expires March 16, 2025. |