1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) De Leon conducted an on site 1 year infection control annual visit to the facility above on 05/06/2022 at 10:50 AM. LPA met with Licensee/Administrator Gabriela Soo and explained the purpose of the visit.
LPA took a physical plant tour of the facility with staff. The facility has submitted a mitigation plan to the department and it has been approved. The facility has an entry point at the front door where everyone entering completes sign-in, temperature and symptom check. All documentation is kept on file. The entry station has hand sanitizer along with a thermometer. The facility has a living room to accommodate activities, a dining room for dining, all areas are spaced to accommodate as much space as possible for social distancing. All equipment, PPE supplies and additional food supply are located in garage. Medications are kept in a locked medication file cabinet in staff office. The staff screen residents for symptoms and temperature 1x's a day and documentation is kept on file. Increased monitoring is conducted if any change of condition are noted or any residents are showing any signs, symptoms or has a temperature. Signs are posted on the front door, entry area and walls in common areas regarding Covid-19. Staff makes sure residents have a mask when leaving the facility on outings into the community. All staff wear face coverings in the facility and when on outings with residents. Facility have areas for visiting inside and outside. The facility also offers virtual and telephone communications to all residents in care. Staff, residents and visitors are informed of the facilities infection control policies. New residents and staff will be tested and negative results received before working or residing in the facility. The facility has procedures and plans for screening, isolation, testing, when to call 911 and notifying all responsible parties and agencies when needed.
Continued 809-C |