13 | On 9/22/2026 at 8:55AM., Licensing Program Analyst (LPA) Luis Gomez met with Director, Reshmi Weinhauer. The purpose of today’s inspection was explained and was for an unannounced- complaint inspection. The licensee, Shanu Mathur arrived to facility during inspection.
Present was the director and 8 staff supervising 32 children. The children present have been properly signed in. LPA inspected facility for health and safety hazards.
During today’s inspection, LPA conducted interviews, reviewed records, and performed observation.
During the course of this investigation, LPA conducted site observations on: 7/15/2026, 8/17/2026, and 9/23/2026. A reviewed the facility records were complete, which included personnel files and children’s files. LPA conducted interviews with the director, staff, and involved parties. (REFER TO LIC9099C, FOR CONT.)
|