1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 | During the inspection, room #4 was inspected. LPA observed that room #4 has yet to be set up as a classroom. The Director states that furnishing, toys, and learning equipment will be placed in the room in a couple of days, pictures of the room will be sent to LPA when everything is ready. The center has submitted an updated application (LIC 200A), and a Facility Sketch (LIC 999).
The boys' bathroom has two toilets, 4 urinals, and 3 sinks. The girls' bathroom has 4 toilets and 3 sinks. Furthermore, each classroom has its own sink. The total number of toilets and urinals is 10, allowing for 150 children. The total number of sinks is 13, allowing for 195 children. Children participating in the toddler option children would be sharing the with preschool children. Director was reminded that children participating in the toddler option program could not commingle with preschool children at any time.
The outdoor had a measurement of 3200 square feet from the previously measured outdoor, allowing for 42 children. The center currently has an outdoor waiver approved from the previous preLicensing inspection. However, due to the increase from 84 to 124, a new rotation scheduled must be submitted.
Prior to approving a capacity increase of 124 Preschool children,
· Fire clearance must be obtained.
· A new rotation scheduled is required, and an updated Personnel Report (LIC 500)
· Picture to be sent to LPA, once furnishing, toys, and learning materials are set up, · A final review is required from the Department before licensure.
The report was reviewed and signed by the Director, Stephanie Lopez. Today's report, 8/24/2021, and notice of site visit will be sent to the Director at STEPHANIEL@BUILDINGKIDZ.COM by the close of business on 8/24/21. Confirmation of receipt is required. |