1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 | Director requested to add the former school-age yard for the preschool yard. An updated LIC 999 was received on 08/16/2023. An updated LIC 200A will be mailed to the San Jose Regional office. Measurements were conducted during today's inspection. The measurement are as followed:
(66.917 x 43.333 = 2,899.717) minus encumbered space 20.654 = 2,879.060
Other preschool yard was measured on 01/31/2023. The measurements are as followed:
80.083 x 67.417 = 5398.955 minus encumbered 2.417 x 4.167 = 10.071 + 5.167 x 2.833 = 14.638 + 2(1.167 x 1) = 3.34 = 28.049 = 5398.955 - 28.049 = 5370.906
Total Outdoor Space: 8,249.966 divided by 75 = 109 children
As a result of this inspection, there were no deficiencies issued. Exit interview conducted and report was reviewed with Director Maarit McCrossen. A notice of site visit has been issued and must remain posted for 30 days. |