25 | Licensing Program Analyst (LPA), James Santos and Regional Manager (RM), Tony Studebaker arrived at the facility today to conduct a follow up pre-licensing inspection and met with Applicant Representative, Zhen Zhen Li and Director, Selene Siqi Li.
Applicant Representative contacted RM on 9/15/2022 stating that all physical plant repairs have been completed. LPA and RM completed the inspection of the facility today and confirmed all the repairs have been completed. The pond was also inspected and was observed to be filled with dirt and is no longer a hazard.
Per RM, license will be approved for 8 infants and will be effective on 9/16/2022.