25 | Licensing Program Analyst (LPA) Simi Rai conducted a case management visit to do a wellness check after power was restored at the facility. LPA Rai met with Interim Executive Director, Brenda Ritter and stated the purpose of the visit.
LPA Rai interviewed Maintenance Director (MD) Wesley McKinley. The power went back online on March 6th, 2024 and no issues to report. PG&E and City of San Jose has conducted inspections and the facility passed the inspections. The maintainence team will conduct weekly and monthly checks on the facility's generator and power grid.
LPA Rai toured the facility and observed the facility's electrical grid and observe the power generator was removed from the premise.
LPA Rai observed random resident rooms and observed the room temperature within range, functioning lights and fridge/freezer in working condition.
No deficiencies were cited at this time as per California Code of Regulations, Title 22.
This report was reviewed with Interim Executive Director, Brenda Ritter and a copy of the report was provided. |