32 | LPA observed the following corrections needed:
· Facility signal system per regulation:
85088 (f)(1)(A-C) Fixtures, Furniture, Equipment and Supplies
(f) Facilities shall meet the following signal system requirements:
(1) In all facilities with a licensed capacity of 16 or more clients, and all facilities having separate floors or separate buildings without full-time staff there shall be a signal system which has the ability to meet the following requirements:
(A) Operation from each client's living unit.
(B) Transmission of a visual and/or auditory signal to a central location, or production of an auditory signal at the client's living unit which is loud enough to summon staff.
(C) Identification of the specific client's living unit from which the signal originates.
· Supply of linens: blankets, bedspreads, top/bottom bed sheets, pillow cases, mattress pads, rubber sheeting, bath/hand towels, and washcloths
85088 (c)(4)(A) Fixtures, Furniture, Equipment and Supplies
(c) The licensee shall ensure provision to each client of the following furniture, equipment and supplies necessary for personal care and maintenance of personal hygiene.
(4) Clean linen in good repair, including lightweight, warm blankets and bedspreads; top and bottom bed sheets; pillow cases; mattress pads; rubber or plastic sheeting, when necessary; and bath towels, hand towels and washcloths.
(A) The quantity of linen provided shall permit changing the linen at least once each week or more often when necessary to ensure that clean linen is in use by clients at all times.
· Shaded area for outdoor activity
85087.2 Outdoor Activity Space
(b) The outdoor activity area shall provide a shaded area, and shall be comfortable, and furnished for outdoor use.
***Pre-licensing is incomplete with corrections needed. Applicant to correct the items listed above. LPA will return on Thursday 02/16/2023 for a scheduled subsequent pre-licensing inspection to complete inspection.
The Component III Orientation was completed during today's visit. LPA will submit the pre-licensing reports to Application Unit Analyst in Sacramento; Application Unit Analyst will notify applicant of application status.
|