25 | Licensing Program Analyst (LPA) conducted a required 1 Year inspection on 2/16/22 at approximately 12:40pm; LPA met with Administrator Robert Alvarado. The inspection is focused on the infection control procedures and practices of this facility.
Facility has an approved dementia plan of operation. There is an approved hospice waiver for ten (10) residents. Mitigation plan was reviewed by the Department on 3/1//21. Fire clearance is approved for 120 nonambulatory, which includes 20 bedridden. Fire clearance also approves delayed egress. Fire extinguishers, eighteen (18) of them, were tagged and inspected as required-1/25/22. All visitors, essential visitors, and staff are screened upon entry into the facility, in the front lobby. All screenings are logged. Facility building was found to be clean, orderly, and at a comfortable temperature with all exits free from obstruction. Facility has a sufficient supply of personal protective equipment(PPE) in both the assisted living, and memory care areas. Residents have masks available to them for their use if needed and/or wanted.
Administrator stated that staff wear masks at all times in the facility, and also when providing care services to the residents in and out of the facility. Administrator and staff observed by the LPA all had a mask on during the inspection.
No deficiencies found in the areas inspected.
No citations issued.
Exit interview conducted with the Administrator. |