STATE OF CALIFORNIA - HEALTH AND HUMAN SERVICES AGENCY

FACILITY EVALUATION REPORT
CALIFORNIA DEPARTMENT OF SOCIAL SERVICES
COMMUNITY CARE LICENSING DIVISION
CCLD Regional Office, 1000 CORPORATE DR #100
MONTEREY PARK, CA 91754
FACILITY NAME:ANEW DIRECTION ADULT LIVINGFACILITY NUMBER:
198602405
ADMINISTRATOR:PATRICIA DUFRENNEFACILITY TYPE:
735
ADDRESS:2300 S PACIFIC AVETELEPHONE:
(909) 210-0365
CITY:SAN PEDROSTATE: CAZIP CODE:
90731
CAPACITY:72CENSUS: DATE:
06/12/2020
TYPE OF VISIT:Case Management - OtherANNOUNCEDTIME BEGAN:
11:00 AM
MET WITH:Patria Duffrenne AdministratorTIME COMPLETED:
12:00 PM
NARRATIVE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
On 06/12/2020 at 11:00AM, Licensing Program Analyst (LPA) Jose Calderon and Licensing Program Manager (LPM) Janae Hammond conducted a Technical Assistance (TA) via Zoom to follow-up on the facility due to the situation surrounding the Coronavirus Disease 2019 (COVID-19) and to implement mitigation measures, today TA follow-up visit was conducted over the computer via Zoom with Patria Duffrenne the facility administrator and the purpose of the visit was explained.

The visit consisted of the following: LPA and LPM were given a tour via Zoom of the physical plant with the Administrator, LPA and LPM observed all of the front windows of the building located at 2300 S. Pacific Ave San Pedro had been replaced, but finish work was still in process. Also the back door to the patio had been replaced and it was noted by the LPA that there were 3 benches and a basket ball hoop in the yard. Administrator showed back windows and confirmed that the kitchen window was still in the process of being finished. Also the administrator confirmed that it would take 10 more days to obtain and finish all the windows for the facility.

LPA and LPM observed that the first floor common bathroom had not been finished and that a hallway ceiling had 2 large holes where pipes were exposed due to a water leak. Administrator said that she has been working the city of Los Angeles to obtain the proper permits, but due to COVID-19 there has been delays, but she said to have email from the city allowing her to move forward with repairs.

On the second floor rooms #34, #36, #38 were not being uses by residents and all the bathrooms were still under construction. The Intercom had been installed and was used by the administrator who talked to another staff member in the office. Administrator walked to the office and showed a working phone/intercom. Administrator said her bank refinance with Citizen Bank has been held up due to COVID-19 but hopes to obtain more money for the needed repairs

Zoom exit interview was conducted with the Administrator, and a hard copy was provided via email for records
SUPERVISOR'S NAME: Janae HammondTELEPHONE: (323) 981-3328
LICENSING EVALUATOR NAME: Jose CalderonTELEPHONE: (323) 213-1153
LICENSING EVALUATOR SIGNATURE:

DATE: 06/12/2020
I acknowledge receipt of this form and understand my licensing appeal rights as explained and received.
FACILITY REPRESENTATIVE SIGNATURE:

DATE: 06/12/2020