25 | On Tuesday, October 17, 2023 at 1:30 pm, Licensing Program Analyst (LPA) Manel Estoesta conducted a Required One (1) Year visit. LPA met with the Director Danah Topacio and explained the nature of site visit. Present on this visit were 18 staff, 75 preschool children and 6 Toddlers. The facility operates from Monday to Friday 7:30 am to 6:00 pm.
LPA toured the facility to conduct a Health and Safety Inspection with the Director. The facility has a four Preschool Classrooms which are Dia, Luz, Luna and Estrella. The Preschool has a Toddler Program that is operating in Classroom Sol.
Facility’s License, Parents’ Rights Poster, Personal Rights, Activity Schedules, Menus and Waiver were observed to be posted. The facility is within Staff to Children ratio today. Children were engaged in various activities under the visual supervision of the teachers.
The classrooms, staff restroom, storage room, outdoor activity space and office area were inspected. Disinfectants, cleaning solutions, and other items that are dangerous to children were stored inaccessible to children. Cabinets, drawers, and rooms used for storage were locked. Furniture and equipment such as cribs, mats, cots, tables, changing tables, and chairs were age appropriate and were in god condition, free of sharp, loose, or pointed parts. Floors were clean and free from tripping hazard.
Outdoor activity space for the Toddler Program is separated from the Preschool Program. The outdoor activity spaces are fenced and play equipment were maintained in a safe condition and free of hazards. There were no bodies of water observed. Areas around and under high climbing equipment and slides were cushioned with material that absorbs falls. There were shaded rest areas for children. |